Fine Arts
Fine Arts building in progress
Activity Center
Activity Center walls going up
Gym
Future showcase gym in progress
Blocks in the gym basement ready to build locker rooms and bathrooms
Retaining Wall
Retaining walls all around
Kitchen
Food delivery area for the kitchen
Block work in the kitchen
Deck View
Shot taken from the Art Lab deck
Service Road
Future service road
Heating & Air
Heating and air exchange systems installed
The Great Wall
Future tennis practice wall located top of the eastern boarder
Bus Parking
Future bus parking area
Block Work
Block work going in Fine Arts area
Wednesday, December 1, 2010
Admin/Athletic Bldg
View of the Admin/Athletic Building taken from the atrium exit
Third Floor
Third Floor west side
Activity Center
This shot was taken from the gym at the rebar being prepared to pour concrete for the Activity Center
Visitor from Taiwan
Mr. Tim McGill, the head of Morrison Academy in Taiwan comes for a visit
PAC
Walls are going up in the Performing Arts Center
Tuesday, November 30, 2010
From the Top
Views of the neighboring golf course taken from the top of the admin building
View of the Campus
View of the campus from the BOT conference room
Atrium
View of the atrium taken from the courtyard
Dorm
View of the dorm
Library
Future library located on the second floor
Fine Arts
Future Fine Art labs on the fifth floor
Fly Loft
View of the fly loft from the court yard
Gym
Sealing the gym before final insulation is applied
Music Lab
Future music lab
Headmaster's Office
Future office of the TCIS Headmaster
Assistant Headmaster's Office
Future office space for the Assistant Headmaster
Admin Bldg
Mr. Chang descending from the administration floor
Athletic Building Entrance
Entrance to the athletic building from the covered walkway
Elementary Doorway
View of an elementary classroom doorway that will exit into the exterior covered walkway
Monday, November 15, 2010
Fifth Floor
Fifth Floor supports in place for the final pour on the roof of the dorm
Duct Work
Duct work behind the dorm parent's food pantry
Dorm Updates
Roof top of the dorm
Space between the gym and dorm being filled with soil
Service road behind the dorm
Back deck of the dorm
Soccer Field
View of the future soccer field
View From the Top
Here are some different views of the campus taken from on top of the dormitory
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Artist Rendition of the DTV Campus
Birdseye View of DTV Campus
Photos of the DTV Campus
Full Resolution Photos of DTV Campus
Together We Build Web Photo Album
Canopy outside the Performing Arts Center
Athletic Building
Viewing the athletic building from the north
Campus Stairs
Blog Archive
►
2012
(39)
►
September
(1)
►
August
(7)
►
July
(18)
►
June
(6)
►
May
(7)
►
2011
(135)
►
June
(23)
►
May
(29)
►
April
(34)
►
March
(20)
►
February
(17)
►
January
(12)
▼
2010
(166)
▼
December
(16)
Fine Arts
Activity Center
Gym
Retaining Wall
Kitchen
Deck View
Service Road
Heating & Air
The Great Wall
Bus Parking
Block Work
Admin/Athletic Bldg
Third Floor
Activity Center
Visitor from Taiwan
PAC
►
November
(34)
From the Top
View of the Campus
Atrium
Dorm
Library
Fine Arts
Fly Loft
Gym
Music Lab
Headmaster's Office
Assistant Headmaster's Office
Admin Bldg
Athletic Building Entrance
Elementary Doorway
Fifth Floor
Duct Work
Dorm Updates
Soccer Field
View From the Top
►
October
(36)
►
September
(11)
►
August
(41)
►
July
(4)
►
June
(6)
►
May
(7)
►
April
(7)
►
March
(4)