Sunday, October 17, 2010

Campus View

A view from the stairwell of the administrative and athletic building

Performing Arts Center

Bleacher area to accommodate a full house in the PAC or drama classrooms during school
Lobby area in front of the PAC
Fixed seating area in the PAC
Picture from the stage looking out on the future fixed seating area
Future storage area and dressing rooms next to the stage area
Lumber elevator
Another view of the lumbar elevator to the stage building room











Gym Walls

Insulation and drain board bonded to the entire perimeter of the exterior basement gym walls with two coats of sealant between the concrete and insulation

Clinic

Future clinic for the school and dorm adjacent to the Activity Center lobby area

Sunday, October 10, 2010

View of the campus

View of the new campus taken from the orchard

Academic Building

Fourth floor view of the work being done on the third floor/northern portion of the academic building
Area between the east end of the northern portion of the academic building and the west side of the athletic and administration building

View taken from the courtyard looking at the western side of the academic building


Northern section of the academic building working on the third floor while the western section is working on the 5th floor







Athletic Building Stairs

The stairs from B1 of the athletic building to the first floor where the health classrooms, clinic, and activity center lobby will be located