Sunday, October 10, 2010

Dormitory

A view of the dorm taken from the scaffold on the fourth floor
Plumbing going in on the second floor
Fourth floor being prepared for a concrete pour

Electrical work being done on the second floor





Input from Mr. Johnson

Mr. Johnson inspects the fourth floor science labs to ensure that the sinks are put in correctly

Fly Loft & Stage Area

View of the fly loft from the center of campus
This is where the elevator is located that will lower lumber into the stage construction room behind the stage



Soccer Field

Future Soccer Field Area


Performing Arts Center

Performing Arts Center - this view is looking towards the ground entrance


Library

A couple of the secondary librarians checking out the space for the future split level library

Activity Center

Pictures of the future lobby area, clinic, and health classrooms in the Activity Center