Here is an eastern look from the end of the Fine Arts floor down through the General Affairs work area and future mechanical room locations toward the back. The area directly in front of blue canvas area to the right in this picture is the future location of the stairwell that will ascend all the way to 5 th floor.
Sunday, March 28, 2010
Spring Break progress
The pit in this picture is for the rest rooms on the Fine Arts level off the lobby of the Performing Arts Center This is the iron work prior to the concrete mat that will be poured in early April for the basement of the Fine Arts classroom area
Here is an eastern look from the end of the Fine Arts floor down through the General Affairs work area and future mechanical room locations toward the back. The area directly in front of blue canvas area to the right in this picture is the future location of the stairwell that will ascend all the way to 5 th floor.
Here is an eastern look from the end of the Fine Arts floor down through the General Affairs work area and future mechanical room locations toward the back. The area directly in front of blue canvas area to the right in this picture is the future location of the stairwell that will ascend all the way to 5 th floor.
Sunday, March 14, 2010
Slideshow Video of New Campus
Here are some pictures compiled of the new site and its progress. This also marks the debut of the TCIS Youtube Channel. For more on that, check out the Be Literate blog by the Director of Technology.
Friday, March 5, 2010
Here is an unpdate on the Techno Valley site
As of March 1st, this is the digging of the auditorium area which
is over 75% completed
is over 75% completed
First area to receive concrete is the basement of the dorm
becasue it required the least amount of excavating
This is the western edge of the cafeteria looking west toward the piles that will support the earth
east of the activity center and athletic complex where the excavation is over 90% completed
Tuesday, March 2, 2010