Tuesday, August 31, 2010

Elementary

Elementary classrooms underway
View from the fourth floor looking down towards the future elementary area

Middle School

Looking down the second floor middle school hallway
View of the porch area on the north side of the middle school

Science Labs

A picture of the 4th floor of the academic building where the future science labs will be located

Inspecting

We find Mr. Choi and Mr. Lee checking out the electrical and plumbing work

Atrium

The plumbing has begun in the atrium area

Athletic Building

Two views of the PE office area and future aerobic/fitness rooms


Gymnasium

Two views of the future gymnasium


Cafeteria West Side

A view of the west side of the new cafeteria without the support poles

Dorms

A view down the future middle school dorm hallway
RA Apartment Bedroom

Student dorm room


Future dorm TV room



Dorm family room




Sunday, August 22, 2010

Academic Building Elementary Level

Here is the flooring and rebar work for the first floor of the academic building, which is the location of the elementary division classrooms.

Conferencing About the Elementary Library

Connie Anderson and George Zickefoose meet with Mr. Lee to ensure that the library specs are going as planned.

Elementary Hallway

Here are a couple of shots of the elementary hallway located on the first floor of the academic building.


Walkway

A look down the future walkway of the school.

Campus

Here are a couple of views of the new campus taken from a nearby orchard.


Gymnasium

A picture of the gymnasium taken from the west side of the dormitory.

Dorm Student Rooms

Student rooms and hallway in the second dorm.

Dorm

Here is the space for the future dorm office.
This view of the dorm is looking inside a recreation room, office area, and dorm parent apartment with the golf course in the background.

Cafeteria

This picture was taken looking through the kitchen onto the west side of the future cafeteria.

Thursday, August 12, 2010

Lower Campus

View of the future lower campus looking down the future walkway from in-front of the cafeteria.

Upper Campus

View of the upper campus from the 4th floor of the high school area close to the main stairwell from the atrium.

Performing Arts Center

Progress on preparing the exterior walls for sealing and insulation of the Performing Arts Center before the gravel and soil is filled in against the wall.

High School Stairwell

A picture of the central stairwell leading from the third floor to the fourth floor in the high school building.

Golf Course View from 4th Floor

Here are a couple of shots of the neighboring golf course taken from the 4th floor of the ITGS classroom.


Support Column

The center of a support column before concrete is poured.

Gymnasium

Current status of the gymnasium area with lots of rebar and form work in preparation of a concrete pour in the next week or so that will establish the walls for our future basement gym.


Atrium Area

View of the atrium area and future ELC, Spirit Store, Admissions, Cafe, PTA, and parent lounge from the staircase.

Athletic Building

View of the athletic building progress from the southwest corner of the dorm.

View from the Soccer Field

View of the neighborhood beyond the future TCIS soccer field.

Science Lab Neighborhood View

A view of the neighborhood from the 4th floor of the high school science lab area.

Science Lab Area

This is the fourth floor of the high school science area in preparation for concrete.

Future Science Lab

This is the fourth floor hallway where the science labs will be located on either side.

Fly Loft

Current progress on the fly loft.

Tuesday, August 10, 2010

Parking Lot

Here is the future parking lot area in front of the school.

Fly Loft

Here is a view of the construction of the fly loft located directly over the future PAC stage area.

Dormitory

This is a picture of the mobile crane moving forms to prepare for the second and third floors of the dormitory and for the next concrete delivery to this part of the project.