Activity Center, Gym and Admin building getting some back fill

The basement gym exterior wall has three coats of sealer on it and a 50mm thick foam insulation bonded to the wall with drain board attached to the insulation and as you can see the back filling of soil has begun on the south side which is being packed down as they go.






This is a view the ground level lobby of the Administration and Athletic building which will eventually lead up to the finance office and then one more floor up which will be the top floor and will be the offices of the Development and Marketing Directors offices as well as the offices of the Assitant Headmaster and Headmaster. The lobby level is the same level that the nurses clinic, Health classroom and where the Activity Center will be located on.
If one goes down the stairs from the lobby level you will enter into a hallway leading to the fitness center which is located next to a large multiple Physical Education teacher work area, and both overlook the show case gym which will be large enough for two full court basket ball games going sideways with a curtain to divide them with automated bleachers on the south side. The locker rooms are on the basement floor as well, right off the court area.





No comments:

Post a Comment