Gravel and sand being graded on the soccer field in
preparation for the astro-turf.
Air condition units being installed in the Activity Center.
Bleachers being prepared in the Activity Center.
New view of the Dorms and Cafeterias from the soccer field area.
They are putting down the blocks for the covered sidewalk as
I type. I will post a new view of the walkway when they finish.
Just a little stuck! It was for a good cause; he was trying
to water the trees and plants.
This is what we are leaving behind in the Science Labs
at our O Jung Dong campus.
Mr. Gobius and Mr. Moi Moi worked four very long hard
days along with our GA staff to salvage Science cabinets from
our old campus to be able to use in our new campus. They
are very talented guys and we owe them a great deal of thanks
for all their long hours they put into preparing our science
labs at Techno Valley campus.
The wooden deck above the Performing Arts Center
(PAC).
Discussion about the installation of the tennis courts.
More soccer pitch pictures as they prepare for the turf to
arrive.
Co-Prez Ben Moimoi laying claim on room M308 as the Senior Lounge.
Elementary playground before the rubber material was
put in place.
Playground after the rubber material was installed.
Part of the complete campus walkway at the end of the
grassy area
This is a view of the bank next to the marble stairs outside of
the Administration and Athletic building.
A new look for the dorm parent apartment kitchen and living
room area.
Bleachers in the Activity Center being pulled out part
way.
Dr. Penland and Julie Sul inspecting the bleacher seats in
the Activity Center.
The Activity Center should be cool with all these air
condition units.
The grass is growing!