Tuesday, August 10, 2010

Parking Lot

Here is the future parking lot area in front of the school.

Fly Loft

Here is a view of the construction of the fly loft located directly over the future PAC stage area.

Dormitory

This is a picture of the mobile crane moving forms to prepare for the second and third floors of the dormitory and for the next concrete delivery to this part of the project.

Basement Gymnasium

This is the current progress on the basement gymnasium.

Support Forms

Here is a view of the support forms in progress. These supports forms will soon have a concrete beam spanning them and will be the means to create the support system for the remaining academic space on the eastern end of the academic building. You can see the elementary hallway opening on the ground level in the back of the picture. There will eventually be five levels of academic classroooms to connect to the front portion of the building.

Sunday, August 8, 2010

Update August 9 Admissions/PTA Office Area

This is a picture of the future Admissions Office and testing area, as well as the PTA, and parent lounge area. This picture was taken standing in the atrium looking into the future office areas.




Saturday, August 7, 2010

August 7th update

This is a view of the 3rd floor commons area next to the main staircase leading from the school atrium on the first floor. This space was originally going to be open space above the Middle School commons area below. This floor space was added floor space to the 3rd floor for a High School commons area that students will enjoy in the future.



This picture is made from the north side of the fly loft at actual ground level looking down on the future stage area in the Performings Arts Center.

Here is a view of the school atrium common space taken from the entrance of the Early Learning Center looking towards the future location of the fire place that will be built behind the four men on the left side of this picture. The future entrance to our school is located directly behind the men on the right side of this picture and left of the pillar.

Here below is a view of the Early Learning Center space that will be the future area where staff children will be cared for and educated while their parents are busy teaching during the school day.




This is the concrete delivery to the third level of six total levels of the dorm building. The first level of this building is the location of the school's dual cafeterias, kitchen, and the temporary boarding offices. There is also a full basement to this building that houses a bakery area, dry food storage, laundry room for the school and dorm, as well as resting areas for kitchen workers. There will also be a large art room, and two music practice rooms. Finally there is a large mechanical room that will support the entire building.