Thursday, April 22, 2010

On the Job

Here are some of the people that are actually making the project happen...


Mr. Frazier talks with the gate guard.
Mr. Kim diligently reviews the project plans.








Tuesday, April 13, 2010

April 13 - Alot of concrete!

This is the northwest corner of our Academic building which is the basement area below the future Elementary Library. This is the is the future GA office area at the bottom left of this picture and the room jetting out to the right is the future IB Music room. In cab defelade, the workman is digging in the orchestra pit being pictured from the future lobby of the PAC area
Finishing of the concrete mat in the future Fine Art department and the iron work sticking up is the future support columns for the western part of the Academic building. The columns create a hallway for the Fine Arts area with the lower right portion of this picture from left to right being part of the Orchestra practice room, Chorus room, and the lower right portion of the picture is the Elementary / Middle School Music room


Workmen vibrating concrete at the end of the Fine Arts hallway outside the Elementary and Middle School Music room on the left and in front of the future bathroom area located on the right where the wood forms are showing. Up further on the right are the future Drama classrooms and music practice rooms. Up on the left side about the middle is the future location of the Choir or Chorus room and the Orchestra practice area is located a little further up on the left in front of the iron work.


Two cement trucks out of 160 that delivered 960 cubic meters of concrete that completed the pouring of the Fine Art department floor this thirteenth day of April







Sunday, April 11, 2010

April 12th update

Hallway view in the Academic basement area taken from the future mechanical room looking down to the end of the hall where the GA office and Maitenance work room are located on the right. GA office exterior walls being erected
A view from the southern most part of the Fine Arts hallway next to the future bathroom area looking up the hall toward the GA office at the northern end of the picture


A view to the right of the Fine Arts bathroom area viewing down into the future PAC location where the crane is digging


The future eleveator door in the basment of the maintenance work area that will service the 1 - 5 floors of the Academic builidng.







Thursday, April 8, 2010

Columns in the basement of the Academic building Walls of the GA office area and the Maintenance work area being built





Rebar work in the Fine Arts area getting ready for a one meter thick concrete mat to be poured in about a week







Hill top view looking down on the Academic building under construction H beam support of northen basement wall of the Academic building to be poured when the forms are in place

A full panel of forms for the northern wall of the Academic building being lowered in place by the help of the tower crane

Elevator shaft in the basement of the Academic building that will service all floors


H beam support wall of the eastern soil of the Gymnasium and Activity Center







Monday, April 5, 2010

This is the future drainage and septic tank area for the toilets located in the lobby of the (PAC) Performing Arts Center Here is the second section of the tower crane being installed on the site in order to facilitate moving things quicker and easier to difficult to reach loactions


This picture below is an eastern view from the left side of the lobby looking at the future location of the Performing Arts Center (PAC)
Where the iron rebar is setting is the edge of the future Chorus room next to the Digital Music Lab where the photograph was taken


This is a picture of the mechanical area in the basement of the Academic building






This is a one meter thick rebar that is being prepared for a concrete pour in the Fine Arts hall way looking north. This is a picture below of the future stairwell where the men are standing which will take students from the Fine Arts area of the Academic building up to the atrium.


Another picture of the future 1 meter thick rebar support concrete mat which will be the flooring of the Fine Arts area of the Academic building.


This is the future IB Digital music lab



This is the future location of the Elementary / Middle School music room