Monday, April 5, 2010

This is the future drainage and septic tank area for the toilets located in the lobby of the (PAC) Performing Arts Center Here is the second section of the tower crane being installed on the site in order to facilitate moving things quicker and easier to difficult to reach loactions


This picture below is an eastern view from the left side of the lobby looking at the future location of the Performing Arts Center (PAC)
Where the iron rebar is setting is the edge of the future Chorus room next to the Digital Music Lab where the photograph was taken


This is a picture of the mechanical area in the basement of the Academic building






No comments:

Post a Comment