Finishing of the concrete mat in the future Fine Art department and the iron work sticking up is the future support columns for the western part of the Academic building. The columns create a hallway for the Fine Arts area with the lower right portion of this picture from left to right being part of the Orchestra practice room, Chorus room, and the lower right portion of the picture is the Elementary / Middle School Music room
Workmen vibrating concrete at the end of the Fine Arts hallway outside the Elementary and Middle School Music room on the left and in front of the future bathroom area located on the right where the wood forms are showing. Up further on the right are the future Drama classrooms and music practice rooms. Up on the left side about the middle is the future location of the Choir or Chorus room and the Orchestra practice area is located a little further up on the left in front of the iron work.
Workmen vibrating concrete at the end of the Fine Arts hallway outside the Elementary and Middle School Music room on the left and in front of the future bathroom area located on the right where the wood forms are showing. Up further on the right are the future Drama classrooms and music practice rooms. Up on the left side about the middle is the future location of the Choir or Chorus room and the Orchestra practice area is located a little further up on the left in front of the iron work.
It was a good day for a large amount of concrete to be poured and it took all day to pour this area. Just for some factual information from Mr. Kim In Jong one truck full of concrete costs w 334,000 so you can do the math and figure what 160 trucks cost the school today. I don't know about you but this was an eye opener for me.
ReplyDelete