Tuesday, May 11, 2010

The status of the new school cafeterias as of May 11

A view to the eastside cafeteria from inside the
future kitchen area.

Looking at the east side cafeteria from the top
of the stairs coming up from the dorm basement area.

This picture below is the east side cafeteria
recieving the rebar prep for the 1 meter thick
concrete mat that will follow to form the floor
of this cafeteria.

Looking west out of the future kitchen accross
the future west side cafeteria where the concrete
piles are sticking out of the ground. These piles
are 10 - 15 meters in length depending on their
need to hit bedrock beneath the ground in order
have a strong foundation for the building.
These piles will be cut off later when the rebar
and concrete mat are made.