which is just a portion of the future Elementry
classroom area

picture is stationed in lobby area of the future
cafeteria

and the digger is still working on the slope for the
fixed seating area of the PAC
This is an access road down to the work area
down to the future PAC, and the blue netted
area to the left is the end of the Fine Arts area
which will be below grade or underground

building that is the begining of the mechanical
area of the school

No comments:
Post a Comment