This is the 3rd floor recieiving 8 plus hours worth of concrete work to complete the walls
stairs, and the floor on this section of the academic building.


Here below is the library stair case connecting the 2nd and 3rd floors which recieved
concrete several hours later on Saturday the 24th.


Here below is the future General Affairs office space area in the basement of the Academic building after the support poles have been removed.



Here is a view from the back of the Performing Arts Center looking down toward the future stage area and orchestra pit. The sunny opening in the back of the picture is where the future fly loft will be built.



This view below is made from in front of the General Affairs office area and displaying the hallway of the future Fine Arts Department.






July 24 update

Here is a golf course view from the future window of the 3rd floor library.

Below is a view from the future 3rd floor Science lab which is a view of Prugio apartments.


Below is a picture from the library on the third floor looking out over the future class room
space to be built, the current progress of the Administration / Athletic building as well as the
work on the second floor of the Dorm building.



Below is a view of the top of the Performing Arts Center and the open space in the picture is the
future area for the fly loft, and those walls will continue to be built. The concrete is scheduled
for the side walls and roof of the PAC in about a week weather permitting.




Here is one of the mechnical rooms in the basement of the academic building after the support poles have been removed.





Monday, July 19, 2010

Update on July 20

This picture is taken from the Middle school dorm back porch located directly above the west side cafeteria. The photographer is standing above the private dining area section in the north west corner of this cafeteria. The view shows the progress of the athletic and administration building as well as a distant court side view of the ELC and atrium portion of the academic builiding along with the Middle School second floor walls being erected.


This view below is a blessed site because it has been along time in coming and it is the
gymnasium area in the B1 level of the Athletic and Administration building. This area is finally
receiving the rebar work that will precede the 1meter thick concrete mat which will eventually
be the base for the wooden gym floor.




When looking at this picture below you need to realize that the builing directly
behind the crane is the courtside view of the Early Learning Center (ELC) area which currently has alot of window space. The atrium window areas is located in the center part of the building and then there is a lone dark opening on the right side of the building which is the begining of the Elementary hallway from the corner of the Elementary Library.




Thursday, July 15, 2010

Update of project on July 15

This is a view of the front part of the orchestra pit and the sloped flooring where the 300 fixed seats will be located in the future. Rumor has it that a person can maintain a lifetme association with the school by honoring a family name who was a part of the school either as a parent, board member, teacher, administrator, or supporting missionary. The idea is that a family name would be engraved and fixed on each seat to help connect the past with the future of the organization. The idea is that a prescribed donation amount would earn the donor the right to name a theater seat to honor that person's contribution to the school's past and present. Our development office will have more information on these details in the near future.


This is a view below of the progress being made on the first level above the cafeteria which is the boys hall side of the first of five dorms to be built in phase I. The picture is taken from the interior of the future dorm lounge area directly in front of the future first floor dorm office which is being proposed as the Middle School dorm.


This picture below is the updated progress of the gym area which is at pre-rebar state. The gravel area in front of the concrete covered space will house offices for P.E. teachers, dressing rooms for athletes, clinic space for the school / dorm nurse, lobby areas and bathrooms for the activity center, and gymnasium. This area will also be home to the school's new cardio and weight room space. All of this will be on the B1 / 1st floor levels leaving the 2nd and 3rd floors for the administration office space, conference rooms and shared stairwell and elevator shaft. The wall and the blue netting at the top center of this picture is the west side of the school cafeteria and future west wall of all five dorms being built in phase I.



This picture was taken from the Northwest corner of the school and it is a picture of the service road which will be raised to a level in the future to allow Elementry students and staff the ability to exit their classrooms direct onto ground level. The window to the right in the picture is one of four windows that are showcased in the Elementary Library.