This picture is taken from the Middle school dorm back porch located directly above the west side cafeteria. The photographer is standing above the private dining area section in the north west corner of this cafeteria. The view shows the progress of the athletic and administration building as well as a distant court side view of the ELC and atrium portion of the academic builiding along with the Middle School second floor walls being erected.


This view below is a blessed site because it has been along time in coming and it is the
gymnasium area in the B1 level of the Athletic and Administration building. This area is finally
receiving the rebar work that will precede the 1meter thick concrete mat which will eventually
be the base for the wooden gym floor.




When looking at this picture below you need to realize that the builing directly
behind the crane is the courtside view of the Early Learning Center (ELC) area which currently has alot of window space. The atrium window areas is located in the center part of the building and then there is a lone dark opening on the right side of the building which is the begining of the Elementary hallway from the corner of the Elementary Library.