Tuesday, November 30, 2010

From the Top

Views of the neighboring golf course taken from the top of the admin building


View of the Campus

View of the campus from the BOT conference room

Atrium

View of the atrium taken from the courtyard

Dorm

View of the dorm

Library

Future library located on the second floor


Fine Arts

Future Fine Art labs on the fifth floor

Fly Loft

View of the fly loft from the court yard

Gym

Sealing the gym before final insulation is applied

Music Lab

Future music lab

Headmaster's Office

Future office of the TCIS Headmaster

Assistant Headmaster's Office

Future office space for the Assistant Headmaster

Admin Bldg

Mr. Chang descending from the administration floor

Athletic Building Entrance

Entrance to the athletic building from the covered walkway

Elementary Doorway

View of an elementary classroom doorway that will exit into the exterior covered walkway

Monday, November 15, 2010

Fifth Floor

Fifth Floor supports in place for the final pour on the roof of the dorm

Duct Work

Duct work behind the dorm parent's food pantry

Dorm Updates

Roof top of the dorm
Space between the gym and dorm being filled with soil Service road behind the dorm Back deck of the dorm






Soccer Field

View of the future soccer field

View From the Top

Here are some different views of the campus taken from on top of the dormitory








Tennis Wall

Tennis Court wall

Retaining Wall

This is the northeast corner of the campus being prepared for the retaining wall

Fine Arts

The walls are going up in the Fine Arts area

Sunday, November 14, 2010

PAC consultants

Jim Linton meets with some of the Fine Art & Technology staff to ensure the plans for the PAC are on track



Fly Loft

Fly loft ready for a lid
H beams are installed in the fly loft for the future cat walk

Soccer Field

View of the future soccer field from the roof of the dormitory

Academic Bldg 4th Floor

The fourth floor of the academic building received concrete on November 12

Sunday, November 7, 2010

More November updates of the new campus

This is a picture of the space between the gymnasium and the westside cafeteria and dorm wall.



This is a picture of the Interior Designs rendition of the dorm living room.



This is a view of what half a dorm room will look like but the closets on the right side have been removed from the project allowing more space for the future with mobile closets.




This is a picture of the service road on the north side of the Academic building that will be the road for the buses to use to park above the dorms during the day but it will be the road where the buses will line up in the afternoon to allow students to board in order to go home.








November updates

Here is the Interior Design rendition of the entrance to our school which put the atrium to the right and the Elementary library to the direct left of the central stair case.


This is a rendition of the PAC lobby area with the open area above that allows lots of natural sun light to penetrate into this lobby area.


This is the preperation of the northern portion of classroom flooring for the high school 4th level. The administration and the gymnasium areas are between this long hallway and the 5 story dorm builing at the back center of this picture.




This is a view of the central stairs and the future location of the information desk where the orange scaffolding is located in this picture. Directly to the right of the information location will be the covered walkway which will originate here at the atrium and culminate at the cafeteria lobby area so that sutdents will not need to carry umberellas on rainy days anymore.



This is a view of the Atrium from the front door of the Admissions office area.