Wednesday, June 27, 2012

Scottie Poole is still taking pictures so check these out


Academic building, the second floor outside the Soft
Tech lab is where this picture was taken.



Second floor lobby flooring completed.




Main stairwell back wall in academic building getting 
covered with tile. This wall goes from cellar up to dome. 

We could call it the "Great Wall"
I suppose, or maybe not!



Atrium




Front windows directly above the main 
school entrance.



Third floor hallway of the Academic building.




Nelson Bridge.



Inside view of the business office looking out where 
the waiting area will be located.




A flight of stairs in the Admin building.



Activity center stage picture taken from the sound 
room.




Elementary hallway has lights!



A view of the dorm from the end of the soccer field area.



Dorm parent apartment living room from a kitchen view.





Dorm parent apartment hallway view from the 
living room area.




RA bathroom view made from the doorway.




RA kitchen area view from the corner of the living room.



RA living room view from the kitchen area.




Just outside the East side cafeteria.





Parking lot behind the dorm building.




Service road aligned with trees below.




Front parking lot view below.



Parking lot area next to the green zone.



Parking area outside the Performing Art Center.




Bleacher area in the back of the Performing Art Center.



Music room number two.




Dorm building getting a little exterior 
attention.




Tuesday, June 19, 2012

More pictures from Scottie Poole

The two pictures below are where the container offices
used to be. This space will be the new home to many 
trees to be transplanted from the O Jung Dong Campus.



The entrance to the new TCIS 
school campus and the picture below that is a view of 
some trees being planted around the driveway, step, 
 and ramp entrance to the school.





A view of the wood work in the atrium area of the school.




Material ready to be used to work on the flooring of the 
2nd level of the Academic building.




Work going on in the Elementary Library area.




Curb being installed behind the Fly Loft that will 
serve as the campus outdoor theater and possibly a
bicycle storage area for those choosing to come to 
school via two wheels.




Stairwell directly south of the Administration / Activity 
building. The work crew is putting the finishing touches
on the exterior of the building next to these stairs.




Woodwork above and to the side of the entrance of the 
Activity Center.




The stage area in the Activity Center.





View of the future home of the Activity Center bleacher
storage area (back wall) and sound booth from the 
stage perspective.





Cafeteria ceiling and wall finishing being completed.




Tile installed along with the concrete floor being finished in 
the kitchen area. Ready for kitchen equipment to be delivered
and installed.




A door view of a dorm student room.




A view of a dorm hallway from the recreation area of 
the dorm.



Thursday, June 14, 2012

Some pictures taken by Scottie Poole to keep the blog alive


A view of the southwest corner of the
school. The doorway on the ground floor
 is an entrance to a multipurpose area and
admissions area.



Here is a picture of the entrance to the 
Performing Art Center (PAC).



Here is the main security office on campus. It
will be the main entrance to the campus on the road
to the left of this building.



Service road security building where all traffic
will exit the campus during the day.





Service road area receiving trees from the 
O Jung Dong campus to create a greener
campus.




The covered walkway from the Atrium to the Administration
/ Activity building is under construction and will be most
welcomed to all community members on rainy days.





Elementary hallway is the new home of 
all the construction offices on campus. 
The tree transplants from O Jung Dong 
are the cause of the relocation of all
offices.



The Atrium has received a ceiling this week.




Third floor hallway preparing for the
installation of lights.



The lights are on in the Activity Center.


The Business Office area is receiving the interior designed
curved wall installation this week.




The showcase gym is getting the overhead work completed.
The maple floor is down and ready for the next step.



Cafeteria kitchen is receiving some much needed attention.



The dorms are getting tile on the 
floors.