Here is a third floor
view from the dorm, and is
a view of the tennis court area.
This will be the new home of five
astro turf courts that will be filled with sand.
Reports say it will be a fast draining surface allowing
play to return 15 minutes after the rain stops.
This picture below is a view from the dorm parents
balcony on the northern side of the dorm. It is a view
of the future service road and sidewalk.
Two dorm dads inspect the new handrails installed
in the stairwell of the dorms.
A picture of the bakery area that
was tiled this week.
The bus parking area is located east of the dorm building
and is taking shape this week with curbs being installed.
Dorm dads inspecting the apartment kitchen area of their
future homes.
Hired hand to work on the site.