Tuesday, August 10, 2010
Support Forms
Here is a view of the support forms in progress. These supports forms will soon have a concrete beam spanning them and will be the means to create the support system for the remaining academic space on the eastern end of the academic building. You can see the elementary hallway opening on the ground level in the back of the picture. There will eventually be five levels of academic classroooms to connect to the front portion of the building. 
Sunday, August 8, 2010
Update August 9 Admissions/PTA Office Area
Saturday, August 7, 2010
August 7th update
This is a view of the 3rd floor commons area next to the main staircase leading from the school atrium on the first floor. This space was originally going to be open space above the Middle School commons area below. This floor space was added floor space to the 3rd floor for a High School commons area that students will enjoy in the future.


Here is a view of the school atrium common space taken from the entrance of the Early Learning Center looking towards the future location of the fire place that will be built behind the four men on the left side of this picture. The future entrance to our school is located directly behind the men on the right side of this picture and left of the pillar.
Here below is a view of the Early Learning Center space that will be the future area where staff children will be cared for and educated while their parents are busy teaching during the school day.

This is the concrete delivery to the third level of six total levels of the dorm building. The first level of this building is the location of the school's dual cafeterias, kitchen, and the temporary boarding offices. There is also a full basement to this building that houses a bakery area, dry food storage, laundry room for the school and dorm, as well as resting areas for kitchen workers. There will also be a large art room, and two music practice rooms. Finally there is a large mechanical room that will support the entire building.
This picture is made from the north side of the fly loft at actual ground level looking down on the future stage area in the Performings Arts Center.
Here is a view of the school atrium common space taken from the entrance of the Early Learning Center looking towards the future location of the fire place that will be built behind the four men on the left side of this picture. The future entrance to our school is located directly behind the men on the right side of this picture and left of the pillar.
This is the concrete delivery to the third level of six total levels of the dorm building. The first level of this building is the location of the school's dual cafeterias, kitchen, and the temporary boarding offices. There is also a full basement to this building that houses a bakery area, dry food storage, laundry room for the school and dorm, as well as resting areas for kitchen workers. There will also be a large art room, and two music practice rooms. Finally there is a large mechanical room that will support the entire building.
Saturday, July 24, 2010
More to see
This is the 3rd floor recieiving 8 plus hours worth of concrete work to complete the walls
stairs, and the floor on this section of the academic building.
Here below is the library stair case connecting the 2nd and 3rd floors which recieved
concrete several hours later on Saturday the 24th.

Here below is the future General Affairs office space area in the basement of the Academic building after the support poles have been removed.
stairs, and the floor on this section of the academic building.
Here below is the library stair case connecting the 2nd and 3rd floors which recievedconcrete several hours later on Saturday the 24th.
Here below is the future General Affairs office space area in the basement of the Academic building after the support poles have been removed.
July 24 update
Here is a golf course view from the future window of the 3rd floor library.
Below is a view from the future 3rd floor Science lab which is a view of Prugio apartments.
Below is a view from the future 3rd floor Science lab which is a view of Prugio apartments.space to be built, the current progress of the Administration / Athletic building as well as the
work on the second floor of the Dorm building.
future area for the fly loft, and those walls will continue to be built. The concrete is scheduled
for the side walls and roof of the PAC in about a week weather permitting.
Monday, July 19, 2010
Update on July 20
This picture is taken from the Middle school dorm back porch located directly above the west side cafeteria. The photographer is standing above the private dining area section in the north west corner of this cafeteria. The view shows the progress of the athletic and administration building as well as a distant court side view of the ELC and atrium portion of the academic builiding along with the Middle School second floor walls being erected.
This view below is a blessed site because it has been along time in coming and it is the
gymnasium area in the B1 level of the Athletic and Administration building. This area is finally
receiving the rebar work that will precede the 1meter thick concrete mat which will eventually
be the base for the wooden gym floor.
When looking at this picture below you need to realize that the builing directly
behind the crane is the courtside view of the Early Learning Center (ELC) area which currently has alot of window space. The atrium window areas is located in the center part of the building and then there is a lone dark opening on the right side of the building which is the begining of the Elementary hallway from the corner of the Elementary Library.