Tuesday, December 7, 2010

Fine Arts

Fine Arts building in progress

Activity Center

Activity Center walls going up

Gym

Future showcase gym in progress Blocks in the gym basement ready to build locker rooms and bathrooms


Retaining Wall

Retaining walls all around


Kitchen

Food delivery area for the kitchen Block work in the kitchen


Deck View

Shot taken from the Art Lab deck

Service Road

Future service road

Heating & Air

Heating and air exchange systems installed


The Great Wall

Future tennis practice wall located top of the eastern boarder

Bus Parking

Future bus parking area

Block Work

Block work going in Fine Arts area


Tuesday, November 30, 2010

From the Top

Views of the neighboring golf course taken from the top of the admin building


View of the Campus

View of the campus from the BOT conference room

Atrium

View of the atrium taken from the courtyard

Dorm

View of the dorm

Library

Future library located on the second floor


Fine Arts

Future Fine Art labs on the fifth floor

Fly Loft

View of the fly loft from the court yard

Gym

Sealing the gym before final insulation is applied

Music Lab

Future music lab

Headmaster's Office

Future office of the TCIS Headmaster

Assistant Headmaster's Office

Future office space for the Assistant Headmaster

Admin Bldg

Mr. Chang descending from the administration floor

Athletic Building Entrance

Entrance to the athletic building from the covered walkway

Elementary Doorway

View of an elementary classroom doorway that will exit into the exterior covered walkway

Monday, November 15, 2010

Fifth Floor

Fifth Floor supports in place for the final pour on the roof of the dorm

Duct Work

Duct work behind the dorm parent's food pantry

Dorm Updates

Roof top of the dorm
Space between the gym and dorm being filled with soil Service road behind the dorm Back deck of the dorm






Soccer Field

View of the future soccer field

View From the Top

Here are some different views of the campus taken from on top of the dormitory