Sunday, April 11, 2010

April 12th update

Hallway view in the Academic basement area taken from the future mechanical room looking down to the end of the hall where the GA office and Maitenance work room are located on the right. GA office exterior walls being erected
A view from the southern most part of the Fine Arts hallway next to the future bathroom area looking up the hall toward the GA office at the northern end of the picture


A view to the right of the Fine Arts bathroom area viewing down into the future PAC location where the crane is digging


The future eleveator door in the basment of the maintenance work area that will service the 1 - 5 floors of the Academic builidng.







1 comment:

  1. The concrete mat in the Fine Arts area is scheduled to be poured on Tuesday Apirl 13th if it does not rain.