Update on June 26 of Dorm building

This picture is taken from the back side of the cafeteria / school kitchen and dorm building from the north east corner of the campus. It shows the progress on this building which has reached the first floor, which will be one of five dorms located in this building.

This is a view from the future soccer field area of the construction of the cafeteria / dorm which is a frontal view of the ground floor cafeterias and the process of the first floor which when completed will be one dorm out of five to be built here. The first floor will more than likely be designated the Middle School Dorm leaving 2nd - 5th floors as High School Dorms.